We plan, we design and we deliver for our clients to provide infrastructure to the community. Recent projects completed by MA Civil include:
Deakin University Student Accomodation – Burwood and Geelong 2017
Craigieburn Splash Aquatic Centre and Athletics Track 2016-2017
Peninsula Golf Clubhouse Redevelopment
Westfield Doncaster 5 Level Car Park
323 La Trobe Street Melbourne
Westfield Southland ticketless parking
116-120 Martin Street Brighton
Helio Apartments Flemington Rd
96 Camberwell Road East Hawthorn
Quest Dandenong
Royal Elizabeth Apartments
Hume Aquatic Centre
2015-16 Brighton Mazda showroom
Nexus Business Park Buildings 5 ,3, and 8 – Mulgrave 2015-16
30 Prohasky St
312 LaTrobe Street Melbourne
Syndal Railway Multi Level Car Park 2015
Hunt Club Shopping Centre – Cranbourne 2015
30 Prohasky Street Port Melbourne 2014 -15
Ruyton School Girls School – New McCrae Building 2015
Fulham Prison Expansion Project 2014
Parliament of Victoria – front entry steps waterproofing project 2013
Residential Public Housing Units – Heidelberg (above)
The Andalusian – Balwyn – Mixed use development with 3 levels of basement
Trotting Training Complex- Cranbourne
Parks Victoria – Flood Recovery Works
Kooringal Golf Course – Clubhouse Extension
V8 Super Car Facilities-Sandown Motor Raceway
Caulfield Racecourse Reserve Enhancement
Highlands Estate – Aitken Boulevard – Gabion Structures (above)
Parade College – Bus Parking Facility – Bundoora
Grand Boulevard- Craigieburn
Design and documentation of the Malcolm Creek Bridge.
Saltwater Coast Estate – Point Cook
Design and documentation of bridges, boardwalks, jetties and shelters within a brand new housing estate.
Caroline Street – Hawthorn
Redevelopment of a 35 unit inner city public estate to upgrade the complex for modern living.
RMIT – Melbourne
Design of an outdoor, renewable energy laboratory on the roof of an inner city campus building.
Data Centres
Design of an ancillary infrastructure to support and protect vital equipment within secure and controlled environments.
Royal Exhibition Building – Carlton
Design and documentation of 1.35 million litre below ground reinforced concrete water storage tank beneath a bus parking zone. The tank stores rainwater from the roof of the exhibition building for use in irrigating the adjacent Carlton gardens.
Williamstown Town Hall
Design and documentation of new roof structure, roof drainage system and façade restoration to protect the interior of this significant heritage listed building and façade restoration.
Whittington Town Centre – Geelong
Rejuvenation of town centre to create a new focal point for the community.
Ivanhoe Grammar – Ivanhoe Campus
Design of rock filled rainwater storage facility beneath a new synthetic grass oval. The stored water is used to irrigate the school’s main oval.
Caulfield Racecourse
Redevelopment of mounting yard and new television studio.
The Porch – Frankston
Redevelopment of the approach and surround to a significant beachfront facility.
Delacombe – Ballarat
Design of wetlands & stormwater cleansing facilities for urban renewal project.
RMIT University
Design of renewable energy classroom & blackwater treatment plant.
Waste Management –
Changes to methods of waste materials handling on public housing estates to improve the triple bottom line.
Public Housing Estates at Richmond, Williamstown and Footscray – Melbourne for DHS
Feasibility study with costing for rain water storage tanks as a prototype for all other inner urban estates.
Essendon Airport – Melbourne
Design, documentation and construction stage services for infrastructure upgrades.
Demolition
Documentation and implementation to meet OH&S requirements for redevelopment of public housing estates, aged care facilities and industrial estates